The Council of Scientific and Industrial Research has published a tender for "Renovation of chemical Fume-hoods at Jankipuram campus of CDRI, Lucknow." on the 02 Apr 2026. This tender belongs to College Building Construction category. This tender is published in Lucknow, Uttar Pradesh location. The vendors interested in this tender and related College Building Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: non residential buildings Tenders | all civil works Tenders | non residential buildings construction Tenders
Related categories: Bank Building Construction Tenders | Bank Repair Tenders | Fire Station Construction Tenders |
Around 34545 tenders were floated in Uttar Pradesh in the past month with major spending on road repair Tenders, road construction Tenders, road relaying Tenders
| Tender Title | Renovation of chemical Fume-hoods at Jankipuram campus of CDRI, Lucknow. |
|---|---|
| Tender Description | repair/replacement of pulley & wire and servicing of fume hood lifting shutter complete in all respects. replacement of impeller with casing,main body pp material thickness 10 mm, frp thickness 03 mm, dimension of main body. dia 18”x breadth 6” suction point dia 10”. exhaust point 10 ”motor stand ms stand dimension 10”x10”x10” with angle support three side .size-n-20. replacement of impeller with cashing, main body pp material thickness 10 mm, frp thickness 03 mm, dimension of main body dia. 22”x breadth 8” suction point dia. 10”.exhaust point 10 ”motor stand ms stand dimension 10”x10”x10” with angle support three side. size- n-25. replacement of crompton make, 2 hp motor, 1440 rpm, 3 phase, amp 05,volt 440, rpm 1450. replacement of crompton make, 5 hp motor, 1440 rpm, 3 phase, amp 09, volt 440, rpm 1450 . modification of electronic control (air flow monitor) lighting system to manual system as required. modification of electronic control (air flow monitor) starter system to 5h |
| Comments | repair/replacement of pulley & wire and servicing of fume hood lifting shutter complete in all respects. replacement of impeller with casing,main body pp material thickness 10 mm, frp thickness 03 mm, dimension of main body. dia 18”x breadth 6” suction point dia 10”. exhaust point 10 ”motor stand ms stand dimension 10”x10”x10” with angle support three side .size-n-20. replacement of impeller with cashing, main body pp material thickness 10 mm, frp thickness 03 mm, dimension of main body dia. 22”x breadth 8” suction point dia. 10”.exhaust point 10 ”motor stand ms stand dimension 10”x10”x10” with angle support three side. size- n-25. replacement of crompton make, 2 hp motor, 1440 rpm, 3 phase, amp 05,volt 440, rpm 1450. replacement of crompton make, 5 hp motor, 1440 rpm, 3 phase, amp 09, volt 440, rpm 1450 . modification of electronic control (air flow monitor) lighting system to manual system as required. modification of electronic control (air flow monitor) starter system to 5h |
| Published Date | |
|---|---|
| Due Date | 23 Apr 2026 00:00:00 |
| Estimated Value | 22.52 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |