The Sarsawa Saharanpur Kisan Cooperative Sugar Factory Ltd has published a tender for "LAYING OF RCC ROAD IN FRONT FROM BOILING TO SUGAR GODOWN NO.08" on the 21 Feb 2026. This tender belongs to CC Road category. This tender is published in Saharanpur, Uttar Pradesh location. The vendors interested in this tender and related CC Road tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: cc road Tenders | road Tenders | road and drain Tenders
Related categories: CC Road Tenders | Bus Bay Tenders | Road related beautification Tenders |
Sarsawa Saharanpur Kisan Cooperative Sugar Factory Ltd issued 0 tenders for CC Road last year
With, 0 floated just last month.
| Tender Title | LAYING OF RCC ROAD IN FRONT FROM BOILING TO SUGAR GODOWN NO.08 |
|---|---|
| Tender Description | laying of rcc road in front from boiling to sugar godown no.08 earth work in excavation in ordi. soil …. as per dsr no 2.8.1 150.00*6.00*0.30= 270.00 p.c.c in 1:4:8 cement ,sand v,stone ballest . in foundation …. as per dsr no 4.1.8 1*200.00*6.00*0.10 =120.00 supply and laying of rbm under floor including cost of all material ,labor (prev.rate approved)…1*200.00*6.00*0.10=120.00 laying of r.c.c m-25 in cement .c/sand ,grit 20mm in road including cost of all material ,labor t&p etc . dsr no 5.1.2 1x220.00x6.00x0.15 = 198.00 total 198.00 m.s work in plane size in r.c.c /r.b in inluding straightening ,cutting ,bending ,placing in position and binding all complete above and below the pl. lvl. tmt bar fe 500 fd or more including cost of material ,labor …. as per dsr no 5.22.1 1320.00*2.50kg/sqm= 3300.00 kg say 3.30 m.t |
| Comments | laying of rcc road in front from boiling to sugar godown no.08 earth work in excavation in ordi. soil …. as per dsr no 2.8.1 150.00*6.00*0.30= 270.00 p.c.c in 1:4:8 cement ,sand v,stone ballest . in foundation …. as per dsr no 4.1.8 1*200.00*6.00*0.10 =120.00 supply and laying of rbm under floor including cost of all material ,labor (prev.rate approved)…1*200.00*6.00*0.10=120.00 laying of r.c.c m-25 in cement .c/sand ,grit 20mm in road including cost of all material ,labor t&p etc . dsr no 5.1.2 1x220.00x6.00x0.15 = 198.00 total 198.00 m.s work in plane size in r.c.c /r.b in inluding straightening ,cutting ,bending ,placing in position and binding all complete above and below the pl. lvl. tmt bar fe 500 fd or more including cost of material ,labor …. as per dsr no 5.22.1 1320.00*2.50kg/sqm= 3300.00 kg say 3.30 m.t |
| Published Date | |
|---|---|
| Due Date | 05 Mar 2026 00:00:00 |
| Estimated Value | 30.31 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |