The Rajiv Gandhi Institute of Petroleum Technology has published a tender for "Construction of Covered RCC Drain at RGIPT Sivasagar Assam Campus" on the 31 Jan 2026. This tender belongs to Drain Construction category. This tender is published in Amethi, Uttar Pradesh location. The vendors interested in this tender and related Drain Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road and drain Tenders | drainage Tenders | drain Tenders
Related categories: Canal construction service Tenders | Main Canal Construction Tenders | Distributary Canal Construction Tenders |
In Amethi district, Uttar Pradesh, a total of 147 Drain Construction tenders have been published, with 1 tenders released last month.
| Tender Title | Construction of Covered RCC Drain at RGIPT Sivasagar Assam Campus |
|---|---|
| Tender Description | description earth work: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge.all kinds of soil. concrete work:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cement : 4 coarse sand(zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). reinforced cement concrete:centering and shuttering including strutting, propping etc. and removal of form forfoundations, footings, bases of columns, etc. for mass concrete walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. shelves (cast in situ) edges of slabs and breaks in floors and wallsunder 20 cm wide steel reinf |
| Comments | description earth work: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge.all kinds of soil. concrete work:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cement : 4 coarse sand(zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). reinforced cement concrete:centering and shuttering including strutting, propping etc. and removal of form forfoundations, footings, bases of columns, etc. for mass concrete walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. shelves (cast in situ) edges of slabs and breaks in floors and wallsunder 20 cm wide steel reinf |
| Published Date | |
|---|---|
| Due Date | 20 Feb 2026 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |