The Moradabad Chief Engineer Public Works Department has published a tender for "Year 2025-26 Long term improvement work of black spot DR Resort identified in 2025 at Badaun-Bilsi-Bijnor road (SH-51) (Civil Road work)" on the 20 Nov 2025. This tender belongs to Road Relaying category. This tender is published in Sambhal, Uttar Pradesh location. The vendors interested in this tender and related Road Relaying tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road Tenders | road and drain Tenders | all civil works Tenders
Related categories: Airport Runway Tenders | Airport Runway Repair Tenders | Road Paving Tenders |
Moradabad Chief Engineer Public Works Department issued 697 tenders for Road Relaying last year
With, 2 floated just last month.
| Tender Title | Year 2025-26 Long term improvement work of black spot DR Resort identified in 2025 at Badaun-Bilsi-Bijnor road (SH-51) (Civil Road work) |
|---|---|
| Tender Description | excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m and including all material, labour, labour cess, t&p royalty, all tasex ect. complete as per direction by i-in-c but excluding g.s.t. construction of embankment with approved material obtained form borrow pit with all lifts and leads, transporting 3.00 upto site, spreading, grading to required and compecting to meet requirement of table 300-2. and including all material, labour, labour cess, t&p royalty, all tasex ect. complete as per direction by i-in-c but excluding g.s.t. construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting |
| Comments | excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m and including all material, labour, labour cess, t&p royalty, all tasex ect. complete as per direction by i-in-c but excluding g.s.t. construction of embankment with approved material obtained form borrow pit with all lifts and leads, transporting 3.00 upto site, spreading, grading to required and compecting to meet requirement of table 300-2. and including all material, labour, labour cess, t&p royalty, all tasex ect. complete as per direction by i-in-c but excluding g.s.t. construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting |
| Published Date | |
|---|---|
| Due Date | 10 Nov 2025 00:00:00 |
| Estimated Value | 3.3 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |