Description: Jaji parisar ki Boundarywall awam railing ka nirman karya Name of Work Jaji Parisar Ki Bahri Boundarywall awam railing ka nirman karya
Details: Earth work in excavation in foundation, in ordinary soil (loam clay or sand) including lift upto 1:5m (5ft) and lead upto 30 m (100 ft) and including filling watring and ramming of excavated earth in to tha tranches of in to the space between the building and sides of foundation tranches or in to the plinth and removal and disposal of surplus earth as deriction by the Engineer I/C. up to a distance of 30mtr. (100ft) from tha the foundation tranches (Sl no. 251) Boring of 30cm dia piles of single under reamed of 50 cm. dia of bulb and 3.5mtr depth in black cotton soil with hand operated auger machine including all labour T&P etc for proper completion of work as per IS code 2911(part-III)1980 Cement concrete with 4 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 8:4:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (SI No. 281) R.C.C. work with cement, approved coarse sand and 2cm (3/4'') ga
Sector: Urban Authority