Details: providing detailed survey of following sections (where ground clearance of bottam conductor seems very low) of 220 kv dc harduaganj-khurja transmission line which is around 60 year old including detail of terrain suitable minimum distance from foreign materials & required safe clearance from roads/highway, power & telecommunication lines and residential areas/building detailed survey drawing porfile, tower schedule, gps survey of line co-ordinates of each new proposed towers in routes will be submitted in scale of 20 meter equal to 1 cm horizontally and 2 meter equal to 1 cm vertically and all devitation points, angles shall be marked in degree in 4 set. i section-loc. no.-09 to 45 ii section-loc. no.-57 to 112 iii section-loc. no.-132 to 142
Sector: Transmission