Details: construction of boundry wall excavation in foundation for structure as per dwaring in ordinarysoil (loam clay or sand) including lift up to 1.5 mtr. & lead upto 30 mtr. & including filling, watering and ramming of excavated earth into the trenches or in to space between the building and the sidding of foundation trenches or in to plinth and removale and disposal of surplus earth as directed by the engineer in charge of 30 mtr. from the foundation trenches. cement concrete 1:5:10 with 4 cm gauge stone blast fine sand of 1.25 mm & cement mortar in foundation under floors including supply of all materials labour and t&p etc required for proper completion of work. m 150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials labour t & p etc. required for proper completion of the work. same as item no. 3 above but in super structure above plinth level up to floor five level (up to five stories) including necessary cutting and moulding of
Sector: Industries and Factories