Details: e/w in excavation in ordinary soil i/c all charge c.c.work in 1:5:10 i/c all charge as per dsr 4.1.10 m150 b/w in 1:4 in foundation & up to plinth i/c all charge as per dsr 6.1.1 m150 b/w in 1:4 in superstructure i/c all charge as per dsr 6.3.1 12mm thick plaster in 1:4 i/c all charge in side as per dsr 13.1.1 15mm thick plaster in 1:4 i/c all charge out side as per dsr 13.2.1 supplying and fixing of informatory sign board including supply of material labour t&p etc. e/w in embankment in ordinary soil with cartage i/c all charge as per dsr 2.25(a) two coat epoxy painting over 1 coat primer on steel worki/c all charge as per dsr 13.52 finshing wall with deluxe multi surface acrylic smooth exterior paint i/c all charge dsr 13.48.1 finishing wall with putty i/c all charge dsr 13.80 two coat distempering with 1st quality acrylic distemper i/c all charge dsr 13.41 p/f of mud phushka on roof i/c all chargeas per dsr 12.16.1 r.c.c. work in 1:1.5:3 i/c all charge as per dsr 5.3 s/
Sector: RDPR