Details: earth work in excavation in foundation in ordinary soil including lift up to 1.50m and lead up to 30.00m including all complete as per si no. 251 concrete with 40mm gauge b/ballast fine sand of 1.25fm and cement in proportion of 12:6:1 in foundation and under floor i/c supply of all materials labour and t&p etc all complete as per si no. 273 class m-150 brick work in cement and fine sand mortar in 1:4 in foundation including supply of all labour material etc up to proper completion of works as per si no. 305 12mm thick plastering in 1:4 cement and fine sand morter on rough surface i/c all completion as per si. no. 584 rcc work in 1:2:4 cement c/sand 20mm stone grite for chamber covered rcc hume pipe 350mm np-3 including collars/spigot jointed with stiff mixture of cement in the proportion of 1:2 (1cement :2fine sand) including testing of joints ms bar for covered sign board and photography
Sector: RDPR