Details: providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.all material, labour, t&p and labour cess etc. complete but excluding gst. providing and applying tack coat with bitumen vg-10 grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(excluding g.s.t.) providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using viscocity grad
Sector: PWD