Details: earthwork filling by b.c. soil cartage soil from 5 km distance by t.t. including lead and lift etc. complete work construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401 cement concrete with 4cm (1/2") gauge approved stone ballast, approved coarse sand, cement in the proportion 1:4:8 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. si no. 281 excavation in foundation in ordinary soil (loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling, watering & ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus e
Sector: RDPR