Details: towan hall earth work in cutting ot in filling in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 meter (20") in depth and earth work in emvankment to be in 20cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 mete (5fts) lits and 30 m (100") lead. the earth from cutting to be used in making filling or to be deposited as spoil banks within 30 meters (100 fts) distance as directed by engineer-in-charge (rate is including royality) si no. 253 + 254 counstruction of granular sub- base by providing close graded material, speading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 providing laying spreading and compacting stone aggrefates of specific size to water bound macadam spedification including spreading in uniform thickness, hand pcak
Sector: Urban Authority