Description: Construction of CC Road in Maharana Pratap Residentail Scheme Karoli Name of Work
Details: Earth work in excavation, including stacking/disposal of surplus material with all lifts lead upto 495 metres, exclusive of compensation of earth [MoRTH specification : Clause 301 to 305] Manually, with lift upto 0.5, combined lead upto 50 meters including breaking of clods. Road Providing and laying granular sub-base meterial having P.I. not more than 6, including spreading in layers not exceeding 150 mm compacted thickness and consolidation by 8-10 tonne power roller to required camber and grade including cost of water and hire charges of machinary including T&P with all lead (Compacted thickness to be measured) as per MoRTH specification table 400-1, 400-2 For grading-I with CBR value not less than 30 to attain 100% proctor density. Road Providing and laying Controlled cement concrete for cement concrete pavements including mixing and virations concrte with necessary needle vibrators and surface with screed board vibrating complete in all respect with 20/25 mm stone aggregate (c
Sector: Urban Authority