The WBPDCL has published a tender for "Service contract for Overhauling job of Unit-4 ESP (4 passes, 72 Nos. Fields) in 2026 at SGTPP." on the 23 May 2026. This tender belongs to Power Generation Equipment Repair category. This tender is published in Murshidabad, West Bengal location. The vendors interested in this tender and related Power Generation Equipment Repair tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: electrical equipments Tenders | blasting services Tenders | bolting services Tenders
Related categories: Turbine Repair Tenders | Turbine RLA Study Tenders | RLA Study of Civil Structure and Misc Tenders |
WBPDCL issued 97 tenders for Power Generation Equipment Repair last year
With, 13 floated just last month.
| Tender Title | Service contract for Overhauling job of Unit-4 ESP (4 passes, 72 Nos. Fields) in 2026 at SGTPP. |
|---|---|
| Tender Description | u#4 esp overhauling job dry cleaning workthorough dry cleaning of esp starting from esp inlet funnel up to esp outlet funnel, all esp hoppers, gas distribution screens, all emitting electrodes and collecting plates and other allied zones.suspension zones in between cerm/eerm frame and esp ceiling to be checked and cleaned properly. after de-synchronization of unit, all hopper doors (288 nos.) are to be opened for smooth removal of ash. after completion of total overhauling job, all hoppers must be checked finally and cleaning & removal of ash/clinker or any other foreign material if persist. then all hopper manholes have to be boxed up properly by total replacement of old gaskets with new ones with adhesive and tightness checking.stipulated period of work: day-2 to day-4- 04 number of separate manpower gangs to be engaged for working at a time in 04 esp passes. report to be submitted to department by 4th day evening or 5th day morning. water jet cleaning workthoroughly hp water jet was |
| Comments | u#4 esp overhauling job dry cleaning workthorough dry cleaning of esp starting from esp inlet funnel up to esp outlet funnel, all esp hoppers, gas distribution screens, all emitting electrodes and collecting plates and other allied zones.suspension zones in between cerm/eerm frame and esp ceiling to be checked and cleaned properly. after de-synchronization of unit, all hopper doors (288 nos.) are to be opened for smooth removal of ash. after completion of total overhauling job, all hoppers must be checked finally and cleaning & removal of ash/clinker or any other foreign material if persist. then all hopper manholes have to be boxed up properly by total replacement of old gaskets with new ones with adhesive and tightness checking.stipulated period of work: day-2 to day-4- 04 number of separate manpower gangs to be engaged for working at a time in 04 esp passes. report to be submitted to department by 4th day evening or 5th day morning. water jet cleaning workthoroughly hp water jet was |
| Published Date | |
|---|---|
| Due Date | 17 Jun 2026 00:00:00 |
| Estimated Value | 40.93 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |