Details: description:- ussor 2021 items earthwork in filling in embankment, guidebunds, around buried type abutments, bridgegaps, trolley refuges, platforms etc. withcontractor's own earth conforming to soilquality class sq1/sq2/sq3, after preparationof foundations as applicable, benching inexisting banks wherever required, spreadingin layers with motor grader, bringing themoisture content to omc, mechanicalcompaction to specified density and dressingof bank to final profile as per rdsospecifications: rdso/2020/ge: irs-0004 withlatest correction slips. note: 1) foundationpreparation, benching including additionalearthwork on account of this, whereverrequired, shall be paid extra under relevantschedule item for benching. 2) payment forearthwork under this item shall be madebased on the cross section measurementscalculated (i) with original ground profile ofexisting bank based on initial ground levelsbefore doing benching and (ii) final profile ofthe bank worked out with final levels as perpre
Sector: Railways