Details: excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means (item no. 21.02) excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.50 m) by mechanical means ( item no. 21.06) providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with crushed sand/grit, ramming, watering etc. complete. ( item no. 21.40) providing and laying cast in situ/ready mix cement c
Sector: RDPR