| Tender Title |
Construction of CC Road and drain in SC colony of 1) gadadan village and gadadan tanda,2)chandapur tanda, 3) totnalli,4)Meenhabal,5)Beernalli,6)Yadahalli,7)Surwar,8)Sc colony and Bovigalli of Telkur, 9)Construction of Bridge from venktapur ramjinaik tanda to tummalkunta tanda road sedam taluka kalburagi district under KKRDB (Detailed Name of work is mentioned in Bid Document) |
| Tender Description |
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction..with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work;Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipment |
| Comments |
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction..with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work;Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipment |