The Others has published a tender for "Establishment of Temporary Control Room for Monsoon Period in 2026 in Bagalagunte Sub Division" on the 29 May 2026. This tender belongs to Electrical building construction category. The vendors interested in this tender and related Electrical building construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: non residential buildings Tenders | all civil works Tenders | non residential buildings construction Tenders
Related categories: CTVS OT Repair Tenders | Bank Repair Tenders | Fire Station Construction Tenders |
Others issued 0 tenders for Electrical building construction last year
With, 0 floated just last month.
| Tender Title | Establishment of Temporary Control Room for Monsoon Period in 2026 in Bagalagunte Sub Division |
|---|---|
| Tender Description | engaging heavy mazoor uni sr 2023-24, vol-i, page no. a-50, sl no.iv (1) with all lead and lift charges and work to be executed as per direction of engineer incharge of work;supply of tractor- trolley on hire basis including driver, fuel and other incidental charges etc., complete uni sr 2023-24, vol-i, page no. a-47, sl no.127 with all lead and lift charges and work to be executed as per direction of engineer incharge of work;supply of hydraulic excavator of 0.9 m3 bucket, etc., complete [page no-a-44, sl no-49] with all lead and lift charges and work to be executed as per direction of engineer incharge of work;centrifugal water pump [page no-a-42, sl no-13, vol -1, pwd sr-2023-24] with all lead and lift charges and work to be executed as per direction of engineer incharge of work; |
| Comments | engaging heavy mazoor uni sr 2023-24, vol-i, page no. a-50, sl no.iv (1) with all lead and lift charges and work to be executed as per direction of engineer incharge of work;supply of tractor- trolley on hire basis including driver, fuel and other incidental charges etc., complete uni sr 2023-24, vol-i, page no. a-47, sl no.127 with all lead and lift charges and work to be executed as per direction of engineer incharge of work;supply of hydraulic excavator of 0.9 m3 bucket, etc., complete [page no-a-44, sl no-49] with all lead and lift charges and work to be executed as per direction of engineer incharge of work;centrifugal water pump [page no-a-42, sl no-13, vol -1, pwd sr-2023-24] with all lead and lift charges and work to be executed as per direction of engineer incharge of work; |
| Published Date | |
|---|---|
| Due Date | 08 Jun 2026 00:00:00 |
| Estimated Value | 7.14 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |