The KPTCL has published a tender for "Providing new Bank-3 along with 1CX1000Sqmm UG Cable run from 31.5MVA Power Transformer-2 to new bank-3 at 66/11kV Alur Substation coming under Operations Division, Nelamangala on Partial Turnkey Basis including supply of all matching materials/equipments and (including civil works) of all materials/equipments, testing and commissioning." on the 25 Mar 2026. This tender belongs to Electrical Substation category. This tender is published in Bangalore, Karnataka location. The vendors interested in this tender and related Electrical Substation tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related categories: Airport Runway Tenders | Airport Runway Repair Tenders | Bridge and Other Works Tenders |
Karnataka has published 1,233 tenders in Electrical Substation in the last financial year.
Out of these, 21 were published last month.
| Tender Title | Providing new Bank-3 along with 1CX1000Sqmm UG Cable run from 31.5MVA Power Transformer-2 to new bank-3 at 66/11kV Alur Substation coming under Operations Division, Nelamangala on Partial Turnkey Basis including supply of all matching materials/equipments and (including civil works) of all materials/equipments, testing and commissioning. |
|---|---|
| Tender Description | supply portion -11kv ug cable, 1cx1000sqmm;supply portion - control cable, 19cx2.5sqmm;supply portion - control cable, 4cx4sqmm;supply portion - 11 kv heat shrinkable termination kit for xlpe cable 1cx1000sqmm indoor type;supply portion - 11 kv heat shrinkable termination kit for xlpe cable 1cx1000sqmm outdoor type;supply portion -11kv cable terminating structure of lv side of power transformer (for additional circuit - weight of steel = 0.069 mt);supply portion -11kv cable terminating structure of lv side of power transformer (weight of bolt and nuts = 0.003mt);e & tc portion - , alignment and fixing to the foundation, indoor/outdoor 11kv switchgear panel/unit including movement from the point of unloading to the point of .;e & tc portion - , alignment and fixing to the foundation, 11kv kiosk / annunciation panel/unit including movement from the point of unloading to the point of .;e & tc portion - laying of 11kv power cables 1cx1000sqmm. in existing trench/gi pipe/stoneware pipe/ |
| Comments | supply portion -11kv ug cable, 1cx1000sqmm;supply portion - control cable, 19cx2.5sqmm;supply portion - control cable, 4cx4sqmm;supply portion - 11 kv heat shrinkable termination kit for xlpe cable 1cx1000sqmm indoor type;supply portion - 11 kv heat shrinkable termination kit for xlpe cable 1cx1000sqmm outdoor type;supply portion -11kv cable terminating structure of lv side of power transformer (for additional circuit - weight of steel = 0.069 mt);supply portion -11kv cable terminating structure of lv side of power transformer (weight of bolt and nuts = 0.003mt);e & tc portion - , alignment and fixing to the foundation, indoor/outdoor 11kv switchgear panel/unit including movement from the point of unloading to the point of .;e & tc portion - , alignment and fixing to the foundation, 11kv kiosk / annunciation panel/unit including movement from the point of unloading to the point of .;e & tc portion - laying of 11kv power cables 1cx1000sqmm. in existing trench/gi pipe/stoneware pipe/ |
| Published Date | |
|---|---|
| Due Date | 10 Apr 2026 00:00:00 |
| Estimated Value | 26.84 Lakh |
|---|---|
| EMD | 0 INR |