Details: dismantling of flexible pavements and disposal of dismantledmaterials and stacking serviceable and unserviceable materialsseparately. bituminous course. -- with all lead, lift, loading, unloading, labour, fuel, hire charges of machineries, equipments including all incidental charges as per detailed specifications etc., complete and as per directions of the engineer in charge of the work.;scarifying existing granular surface to a depth of 50 mm bymanual means. -- with all lead, lift, loading, unloading, labour, fuel, hire charges of machineries, equipments including all incidental charges as per detailed specifications etc., complete and as per directions of the engineer in charge of the work.;wet mix macadam (plant mix method) providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver/grader
Sector: RDPR