Description: Routines on NOVEC system to be undertaken as per RFP Name of Work Yearlu routine on NOVEC 1230
Details: Yearly routine on NOVEC 1230 E-637 Yearly routines on NOVEC fire fighting system will be falling due tentatively in early Feb 25. Following jobs are to be undertaken as per maintenance schedule(a) Check protected enclosure for structural changes:- (i) Dimensions (ii) Use (iii) Fire loads(b) Check the protected enclosure for permeability:- (i) Devices that prevent unintentional opening(c) Check documentation and labels:- (i) Report book (ii) Operating manual (iii) System labeling (iv) Labeling of the protected enclosure, escape routes, etc.(d) Check activations and switch-offs ventilation fans, pumps, incinerator, purifier, AHU etc in the event of an alarm through manual release.(e) Check the relaying of alarms.(f) Check electrical release devices.(g) Check pneumatic release devices:- (i) Activation through pneumatic release device (PAE).(h) Check manual release devices.(j) Visual inspection of valves fitted on NOVEC cylinder along with electrical components.(k) Check com
Sector: Defense