Details: supplying all material, labour t&p and setting up boring equipments including of suitable staging for installation and dismentalling and removing the same after boring equipments cleaning and levelling the site excavation of mud pit channels etc. supplying all labour t&p and transporting the boring pipes and top casing grouting pipes, pvc pipes and fittings, pvc well screens, bentontie & gravels etc to work site and return including loading and unloading etc. complete as per direciton of engineer-in-charge.(transportation for upto 5.00 km) supplying all labour t&p and drilling pilot bore not less than 102mm dia without casing pipes in all kinds of soil & rock for the following depths excluding of supply of necessary boring pipes, including supply of necessary cutting equipments extra sock (test of 3 local @40mtrs) supplying all mateials, labour, t&p and lowering the 300mm dia top casing pipe into position and removing the same after use as per direction of engineer-in-charge. s
Sector: University