Details: evacuation of ash from ash pond of ttps up to all possible lift and including dewatering as required, loading by pay loaders / excavators, washing the outside of dumpers/trucks as per specification on approved route and unloading at disposal site as directed by engineer-in-charge. the rate includes cost of sprinkling of water at the excavation site, haulage route and disposal site, dozing of ash by dozers, compaction of ash by vibro-rollers and levelling the ground at disposal site to avoid floating & rain cuts on disposed ash heaps as per procedure mentioned in scope of work of the nit, as per direction of eic and specification in conformity with pollution control norms, and status and repairing of road in route.the different slabs/leads for above work are as given below: lead 3km to 4 km lead 4km to 5 km lead 5km to 6 km excavation of earth/soil and carriage by truck/dumper and spreading this over defined ash disposal area to make a 300 mm compressed soil blanket on the ash evacuated
Sector: Power Sector