Details: dismantling tile work in floors and roofs laid in cement mortar/ including flooring (4") including stacking/ disposal of material within the campus as directed by eic with all leads & lifts. dismantling old plaster or skirting, raking out joints and cleaning thesurface for plaster including disposal of to the dumping ground within prescribed lead. dismantling g.i. pipes (internal work) including taking out the pipes, manually/by mechanical means including stacking of pipes within prescribed lead as per direction of engineer-in-charge :15 mm to 40 mm nominal bore. dismantling c.i./pvc pipes manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes and lead at site within prescribed lead as per direction of engineerin- charge upto 150 mm diameter providing and laying in position cement concrete of specified grade including the cost of centering and shuttering. all work up to all levels.1:3:6 (1cement: 3 fine sand: 6
Sector: University