Description: Face lifting work of eastern side wall from ground to top floor of Prayukti Bhavan Jadavpur University Main Campus for protect water seepage Name of Work Face lifting work of eastern side wall from ground to top floor of Prayukti Bhavan Jadavpur University Main Campus for protect water seepage
Details: Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing within a lead of 75m as directed.Section-B, Item-10 Dismantling R.C. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars.a) In ground floor including roofSection-C, B, Item-3,a/b (b) Extra rate for each addl floor over the rate of ground floorSection-C, B, Item-3,a/b Cutting chase upto 125 x 150 mm. and subsequent mending of damages(a) in brick wall [Cement-3.6 Kg/Mtr]Section-B, Item-11,a/b (b) in concrete wall [Cement-3.6 Kg/Mtr]Section-B, Item-11,a/b Removal of ,earth etc. from the working site and disposal of the same beyond the compound, in conformity ……………... direction of Engineer in chargeSection- B, Item-13 Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed,
Sector: University