Details: ash pond evacuation, stps evacuation of ash from different filled up ash ponds ats.t.p.s. up to all possible lift including dewatering, as required loading by pay loader/excavator,washing the outside of dumper/ trucks/hyvas as per specification/ direction of engineer-in-charge, the rate should include cost for sprinkling water at the excavation site. as per direction of engineer-in- charge and specifications in conformity with pollution control norms and statutes nuisance free transportation of the ash in leak proofdumpers/trucks as per the specification and approved route and unloading at the disposal site / road construction projects sites / end users place / any other designated places outside plant boundary) from stps/wbpdcl ash pond or any other approved site as directed by the engineer-in-charge. the rate should include cost for sprinkling water at haulage route and disposal site, as per direction of engineer-in-charge and specifications in conformity with pollution control norm
Sector: Generation