Details: job work order 1. soil investigation:conducting soil investigation (bore hole) and trial pit as per is: 1892-1997 by manually / hydraulic/calax rotary drilling of 100mm diameter with casing pipe/bentonite slurry if required, for supporting inner collapsible stratumv below water table with holes/helical auger in all sorts of soil up to depth of 8.00mtr (expect soft soil/boulder/soft to hard rock) or up to the depth of refusal (n>50). conducting standard test (spt) at regular interval & submit the sbc report. submission of proper analytical & graphical report with detail calculation & design of soil bearing capacity, soil bearing pressure, type of foundation etc, as per codal provision. mobilization and demobilization of tools/equipments and personnel required to execute the job, including lodging & boarding expenses.number of bore holes-022. architecture services:preparation of complete conceptual plans, architectural drawings (elevation, sections and schedule of finishes ), site pl
Sector: Defense