Details: excavation in trenches n.exc 1.5m wide and n.exc 1.5 m in depth for foundation etc or for shafts, wells, cesspits, manholes, pier holes etc n.exc 10 sqm on plan and n.exc 1.5m in depth and getting out in soft/loose soil complete all as per specified and as directed by engineer-in-charge. returning, filling in, including spreading, leveling, watering and well ramming in layers n exc 25cm complete all as per specified and as directed by engineer-in-charge. removing excavated material not exc. 50 m & depositing where directed at a level not exc. 1.5 m above starting point complete all as per specified and as directed by engineer-in-charge. demolition of brick work, built in any cement mortar including all quoins, arches, pillars, etc. complete all as per specified and as directed by engineer-in-charge. m&l for brick work with fly ash bricks, straight or curved on plan exc 6m mean radius, built in cement mortar 1:6 complete all as per specified and as directed by engineer-in-charge. taki
Sector: Defense