Details: excavation in trenches in any type of soil n exc 1.5 mtr in width and n. exc 1.5 mtr in depth and getting out all as required for laying of cables, foundation, filling of poles or stays complete all as specified and directed by engineer-in-charge. removing excavated material to a distance not exceeding 50 meters and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed by engineer-in-charge. returning, filling in, including spreading ,leveling, watering and well ramming in layers not exc 25 cm each all as required complete all as specified and directed by engineer-in-charge. m & l for good quality dry sand cushioning to under ground electric cable on layer of 8 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified and directed. note: punned thickness of sand shall be measured. supply and laying sub class 'b' bricks of (230x115x75 mm) or of size locally available , laid
Sector: Defense