Details: excavation in trenches n.exc 1.5 mtr wide and n.exc 1.5mtr in depth for foundation of pole and laying of ug cable and getting out in any type of soil complete all as specified and directed. returning filling in and including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each complete all as specified and directed. supply & laying of approved quality sand under cable upto 15cm before laying the cable and 8cm over the cable after laying, punned down to overall thickness of 18cm in trenches for cable cushioning complete all as specified and directed. (punned thickness shall be measured) material and labour for well burnt, old size sub class 'b' brick for covering protection to the eletric cable laid dry flat transversally along the length of cable with width equal to length of brick complete all as specified and directed. removing excavated material n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point c
Sector: Defense