Details: excavation in trenches in any type of soil not exceeding 1.5 mtr wide and n.exe 1.5 mtr depth including getting out all as specified and directed.note : manual excavation to be done. during excavation if any damage occured to existing cable any type/ water pipe line, it will be contractor responsibilty to get it repair and make functional by providing new jointing kit etc without any extra cost. contractor has to repair it within 24 hrs so that essential service can not be effected due to such damage.if contractor fails to repair it within 24 hrs penalty @ rs 500/ per day will be imposed to contractor till rectification of defects. in this aspect ge decision will be final , conclusive and binding. returning filling in any type of soil, including, spreading levelling watering and well ramming in layers not exc. 25 cm complete all as specified and directed. removing excavated soils to a distance not exceeding 50 metres and depositing where directed at a level n. exc. 1.5 m above the
Sector: Defense