Details: boq (provn of internal road and plinth for bravo and op site at af stn suratgarh .) surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in soft/ loose soil including cutting of grass, roots, bushes if any and filling of lower portion with soil obtained from cutting after sepration of grass, roots, bushes etc and dressing and removing from site all grass, roots complete all as specified and as directed by engineer-in-charge. forming embankments including raising (or lowering) earth, spreading in layers not exc. 30 cm thick; watering, ramming/rolling and finishing to required size, shape, etc. not exc. 1.5 m high from base, complete all as specified and as directed by engineer-in-charge. removing excavated material exc. 250 m but not exc. 500 m and depositing where, complete all as specified and directed. m&l for of broken stone or boulders of gauge not exceeding 63mm, deposited, spread and levelled in layers not exceeding 15cm thick, watered
Sector: Defense