Details: excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth for foundation and getting out as in soft/loose soil complete all as specified and as directed by engineer-in-charge. excavation in trenches exceeding 1.5 m wide & exc 1.5m in depth and not exceeding 3 m in depth for foundation and getting out as in soft/loose soil complete all as specified and as directed by engineer-in-charge. excavating over areas, n exc 1.5m deep & getting out in soft / loose soil complete all as specified and as directed by engineer-in-charge. m&l cement concrete type c2 1:3:6 (40mm graded aggregate) in foundations, filling and mass complete all as specified and as directed by engineer-in-charge. m&l rcc m30 grade (design mix) using 20mm graded stone aggregate as in foundations including rafts, footings, foundation beams, plinth beams; bases for coloumns, etc basement slabs, under-reamed piles and mass concrete complete all as specified and as directed by engineer-in-charge. m&l r
Sector: Defense