Description: 8547 E8 PROVN OF DEFICIENT UPS TO CERTAIN CRITICAL WARDS PATHOLOGY FOR ENSURING PATIENTS CASE AT INHS DHANVANTARI AND PROVN OF DEFICIENT LIGHTS AND EXHAUST FANS AT OPEN AND CLOSE SCRAP YARD AT DOLLYGUNJ UNDER GE MINNIE BAY NAME OF WORK PROVN OF DEFICIENT UPS TO CERTAIN CRITICAL WARDS PATHOLOGY FOR ENSURING PATIENTS CASE AT INHS DHANVANTARI PROVN OF DEFICIENT LIGHTS AND EXHAUST FANS AT OPEN AND CLOSE SCRAP YARD AT DOLLYGUNJ UNDER GE MINNIE BAY
Details: Supply, installation, testing & Commissioning of online, double conversion IGBT based technology UPS of capacity 60 KVA with 3 phase AC input 300 to 450V and 3 phase AC output 415 ± 1%, 50 Hz, pure sine wave with inbuilt isolation transformer along with suitable number of SMF batteries as per OEM recommendation for minimum 30 mins back up, the AH capacity of each battery shall not be less than 130 AH complete all as specified and as directed.Make: KRYKARD/ Microtek/ LuminousNote: (i) The quoted rate is inclusive of Batteries, inter connecting copper cables along with copper lugs for batteries.(ii) Manufacturer type test certificates/ test reports for equipments shall be submitted by contractor before claiming payment.(iii) The quoted rate deemed to be inclusive of service visit once in three months during defect liability period. Contractor shall submit undertaking on Rs 100 non-judicial stamp paper.(iv) The contractor shall submit technical specification & GA drawings for approval of
Sector: Defense