Description: PROVN OF DEFI VEHICLE PARKING SHED FOR BLDG NO P 79 AND OVERHEAD SHED WITH PLINTH FOR FS SECTION AT MAIN GATE OF HQ CIF K AT SHARIFABAD MIL STN UNDER AGE I CIF K Name of Work PROVN OF DEFI VEHICLE PARKING SHED FOR BLDG NO P 79 AND OVERHEAD SHED WITH PLINTH FOR FS SECTION AT MAIN GATE OF HQ CIF K AT SHARIFABAD MIL STN UNDER AGE I CIF K
Details: Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out hard/dense soil complete all as specified and directed by Engr -in-Charge. Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out hard/dense soil. Excavating in post holes (or similar holes) each n exc 0.5 cu. m, getting out hard/dense soil, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, watering, and removing surplus soil to a distance n exc 50 m and making good surface. M&L for plain cement concrete type C-2, 1:3:6 (using 40 mm graded stone aggregates ) in foundation filling and mass concrete, complete all as specified and directed by Engr-in-Charge. M&L for of gauge broken boulders & stone n.exc 63mm, deposited,spread and levelled in layers n.exc 15 cm thick, watered and rammed
Sector: Defense