Details: earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 metre in width as well as 10 sqm on plan including getting out all kinds of soil and disposal of excavated earth upto 50 metre and lift upto 1.5 metre complete all as specified and directed by engineer-in- charge. earth work in excavation by mechanical means (hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 metre and including getting out and disposal of excavated earth lead upto 50 m complete all as directed by engineer-in-charge. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:4:8 typed2 (graded stone aggregate 40 mm nominal size) complete all as specified and directed. brick work with non modular fly ash bricks conforming to is:12894, class designation 10 average compressive strength in cement mortar 1:
Sector: Defense