Details: consultancy service charges for solid waste management of following scopes:- (a) site visit(b) site development(c) site survey(d) door to door waste survey(e) site planning(f) site designing(g) equipment selection as per waste consultancy service charges for centralized 500 kld capacity sewage treatment plant including following :- (a) carrying out topographical survey, selection of suitable site for stp (bio reactor ) of capacity 500 kld, submission of contour drawing showing all required details like sewer pipeline network, treated water pipeline network etc. and schematic diagram showing detail stp.(b) submission of design details of sewage pipe line network connection from building to stp including manholes of required sizes & depth and collection chamber, if any.(c) submission of design detail of treatment water pipe line network including pumps for distribution of treated water of stp as per requirement i.e gardening, flushing etc.
Sector: Defense