Details: excavation in trenches in soft/loose soil not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for route of cable and getting out complete all as specified and as directed by the engineer-in-charge. returning, filling in soft/loose soil including spreading, leveling, watering and well ramming, in layers not exc 25 cm complete all as specified and as directed by the engineer-in-charge. removing of surplus soil to a distance not exc. 50 meter and depositing where directed at a level not exc.1.5 metre above the starting point complete all as specified and as directed by the engineer-in-charge. m/&l for stone slab 40 to 50 mm thick rough dressed jodhpur stone slab cover in trenches for protection of cable 25 to 30 cm wide and not less then 50 cm in length laid dry abutting each other with gap between adjacent slab not exceeding 10 mm over sand cushioning all as specified and directed by engr-in-charge. supply and laying of local tibba dry sand cushioning and cover (8 cm thic
Sector: Defense