Details: excavation in trenches not exceeding 1.5 m wide and n.exc. 1.5 m deep for foundation of poles/stay/cable etc including getting out in soft/loose soil complete all as specified and directed by engr-in-charge. supply and filling fine ganga sand to the full width of trench for cushioning of cable for cable protection including spreading and punning down complete all as specified and directed. note: punned thickness of sand after laying shall be measured for payment purpose. m&l foe ell burnt old size bricks, sub class b brick laid dry flat with width equal to length of whole brick, as cable protection complete all as specified and directed. removing excavated material n.exc. 50m and depositing where directed at a level n.exc. 1.5 m above the starting point complete etc all as specified and directed. returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeking 25 cm in soft & loose soil complete etc all as specified and directed. plain cement c
Sector: Defense