Details: m&l for carrying out the repairs to transformer,step down,11/0.433 kv , 315 to 400kva at existing position on platform after disconnection of ht/lt connections & earthing lead , opening of transformer cover plate, taking down of transformer oil to a level as required and kept in clean and dry container for re use at same time , repairing/overhauling to the defective parts/components including replacement of unserviceable parts as directed, making connection of the transformer after repair , topping of the tankwith the same transformer oil,dehydrated old oil with new oil as required/directed and testing the transformer all as specified and directed.note: the quoted rate shall be deemed to include for all repairs/replacements, other elements etc to make the transformer fully functional and serviceable to the entire satisfaction of engr in charge. however the payment for the items as included required ordered and executed shall be paid seperately. vaccume dihydration with hot filteratio
Sector: Defense