Details: design, develop, integrate, commission, testing of scada system along with various analysing equipment for water supply system as indicated (but not limited to) in the layout diagram enclosed and as per details attached at table a. the scada system shall comprise of folowing: - (a) master control station with personal computer with latest processor and monitor of suitable size: a led vdu with high quality wall mounted suitable size led screen, ultra-narrow and professional grade shall be provided.(b) laser printer (c) ups with half an hour backup:the uninterrupted power supply (ups) must be capable of providing power to essential components, including central processing units, disks, communication processors, screens, servers, workstations, and scada centre devices such as rtus, plcs, microprocessor controllers, and modems, for a minimum duration of 30 minutes.the contractor may explore the possibility of integrating or replacing ups batteries with a centralized battery system conn
Sector: Defense