Description: PROVN OF FOL STORAGE DUMP WITH ALLIED WORKS FOR ASC AT DALHOUSIE Name of Work PROVN OF FOL STORAGE DUMP WITH ALLIED WORKS FOR ASC AT DALHOUSIE
Details: Excavation in trenches, not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 Sqm on plan and not exceeding 1.5 mtr in depth and getting out in hard/dense soil, complete all as specified and directed. All as per item No. 31 above but depth exceeding 1.5m and not exceeding 3 m Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25Cm, complete all as specified and directed. Removing excavated materials/ soils, not exceeding 50mtrs and depositing where directed at a level not exceeding 1.50mtrs, complete all as specified and directed. Spreading and levelling in layers not exc. 25cm thick well ramming including wateringas required for earth filling under floor, complete all as specified and directed. Excavation in post holes (or similar holes) each not exc. 0.50 , in hard and dense soil and getting out, returning filling in and ram
Sector: Defense