Details: schedule a part-i (building work )note: 1. this schedule is pre priced by mes and the pre priced rate indicated under col 5 signifies this fact only.note: 2. before quoting rate contractor is required to visit the site to ascertain the quality and quantity of work/ balance work / left over job. no claim shall be entertained after quoting of rate and rate quoted shall be final and binding. construction and completion of left over works of building for base ops including briefing hall, stair cases, rcc retaining wall ramps and toilets etc framed structure complete all as specified, directed at site and as shown on drawings. for reference ref appendix 'a1' construction and completion of left over works of covered accommodation for vehicle garage for type b vehicle 03 nos including rolling shutter, framed structure complete all as specified, directed at site and as shown on drawings. for reference ref appendix 'b1' construction and completion of left over works of covered accommodation
Sector: Defense