Details: rough excavation not exceeding 1.5 m deep and getting out soft / loose soil complete all as specified and as directed. excavation over area, n. exc 1.5m in depth and getting out in soft/ loose soil complete all as specified and as directed. excavation over area exc 1.5 m deep and n.exc 3 m deep and getting out in soft/loose soil complete all as specified and as directed. excavation over area exc 3.00 m deep and n.exc 4.50 m deep and getting out in soft/loose soil complete all as specified and as directed. excavation in trenches not exc 1.50 m wide and not exc 1.50 m deep for foundation, laying of pipe or for shafts, wells cesspits, man holes, pier holes, laying of cable etc not exc 10 sqm on plan and n exc 1.5m in depth and getting out in soft / loose soil complete all as specified and as directed. excavation in trenches not exceeding 1.5 m wide for foundation or for shafts, wells, cesspits, manholes, pier holes etc. not exc 10 sqm on plan and exceeding 1.5 m in depth but not exc 3
Sector: Defense