Details: demolition of brick work or stone/boulder masonary built in cement mortor including all quoins,arches,pillars etc complete all as specified and as directed by the engineer-in-charge. excavating in trenches, not exceeding 1.5m wide and not exceeding 1.5m depth for foundation etc or for shaft, wells, cesspits, manholes, pier holes etc not exceeding 10 sqm on plan and n exc 1.5 m in depth and getting out in hard/dense soil complete all as specified and as directed by the engineer-in-charge. excavating over areas, not exceeding 1.5m deep and getting out in hard/dense soil complete all as specified and as directed by the engineer-in-charge. excavating over areas, not exceeding 1.5m deep and getting out in soft/disintegrated rock complete all as specified and as directed by the engineer-in-charge. excavating over areas, exceeding 1.5m deep but not exceeding 3m deep and getting out in soft/disintegrated rock complete all as specified and as directed by th
Sector: Defense