Details: demolition of cement concrete in ground floor and pavings n.exc. 15cm thick (below or above ground level) complete all as specified and as directed. demolition of brick work built in cement mortar complete all as specified and as directed. excavation in trenches not exceeding 1.5m wide and not exceedinf 1.5m in depth; for foundation, etc. or for shafts, wells, cess pits, manholes, pier holes, etc. not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in soft soil complete all as specified and as directed. m & l for moorum filling in floors or pavings laid in layers n.exc.15cm thick, spread, levelled and rammed including watering complete all as specified and directed. m & l plain cement concrete (1:4:8) type d-2 using 40mm graded stone aggregate as in foundation filling and mass concrete complete all as specified and as directed. m & l 600mm bore reinforced concrete pipes, class np2, laid and jointed complete with and including collars complete all as spec
Sector: Defense