Details: schedule 'a' b/r special repair works note: (i) complete removal of existing tiles to be done by using manual means only and removal of mortar by soooth grinding to reach mother rcc slab(ii) ponding test to be carried out after completion of chemical water proofing treatment (iii) if found any leakage/ seapage of swimming pool, repair to be done without any cost to the satisfaction of engineer-in-charge and ge. tri party warranty must be submitted by both manufacturer and contractor to mes(iv) all water proofing work and structural restoration/ retrofitting work are to be carried out by the authorised manufacturer through authorised applicator approved by ge. taking down cement plaster on brick or stone walls or on concrete surface etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed demolition of brick work / pcc block masonry built in cement mortar including all quoins, arches, pillars, etc. all as specified and as
Sector: Defense