Details: lumpsum/ other pre-priced provisional schedules of works lump sum price worked out by the contractor for building works as listed in schedule 'a' part -i brought forward from serial page no. 26 lump sum price worked out by the contractor for internal electrification works as listed in schedule 'a' (part-ii ) brought forward from serial page no. 27 to 28 lump sum price worked out by the contractor for external electrification works as listed in schedule 'a' (part-iii section-i) brought forward from serial page no. 29. extenal electrification works schedule 'a' (part-iii section-ii) s&f flame proof mcb distribution board , spn 12 way type suitable for holding /fixing of 12 no rotary switch attachment system of rating 230volts , cast aluminum alloy lm6, gas/ vapor group of iia & iiib, zone 1 & 2 and ip 65 protection including 200 amp rated bus bar with neutral link including supply & fixing mcb spn 32 amp-01 no & mcb sp 6-32 amp-06 nos complete all as specified and directed. s&f flame pr
Sector: Defense