Details: excavation in trenches not exc 1.5 m wide and not exc 1.5 m in depth and getting it out for laying of cable / pole etc in hard/dense soil returning, filling in, including spreading, leveling watering, and well ramming in layers not exc 25 cm in hard/dense soil all as directed. removing excavated material n.exc 50m and depositing where directed at a level exc. 1.5 cm above the starting point all as directed. m&l for sand cushioning to ug cable laid in trenches all as specified and directed. m & l for providing pcc cable cover class lv type-i of size 250x150x40mm laid in perpendicular to the cable abutting each other all as specified and directed at site. fixing/laying only pcc cable cover any size for cable protection in trenches retrieved from item no 05 here in below complete all as specified and directed. supply and fix in repair gi pipe light grade with all connected accessories of sizes 100 mm dia completed as directed for cable protection labour only for taking down xlpe cable
Sector: Defense