Details: scope of work1. the simulation study will put all coordinates of proposed infrastructure in theirspecified system software which they will bring along with them.2. team of 4 people from oem i.e. m/s tasl will visit this base to study theproposed infrastructure and its dimensions.3. the future effect of proposed infrastructure on functioning of ils specificallylocalizer, infringement in its beam forming area is to be analyzed.4. oem will maintain the secrecy of entire project as upcoming infrastructure isoperationally critical infrastructure
Sector: Defense